Skip to product information
1 of 5

Yoycol

All-Over Print Women's Curved Hem T-shirt (Plus Size)

All-Over Print Women's Curved Hem T-shirt (Plus Size)

Regular price $31.93 USD
Regular price Sale price $31.93 USD
Sale Sold out
Shipping calculated at checkout.
Size
Color
Quantity

Classic round neck women's T-shirt, curved hem design, summer classic short sleeves, very cool and comfortable.

  • Fabric:Jersey(95% polyester and 5% spandex)
  • Regular fit
  • Short sleeve, crew neck, curved hem.
  • Fabric weight: 180g/m²
  • Stitch Color: black or white, automatically matched based on patterns.
  • Care Instruction: machine wash cold with similar colors, do not bleach, tumble dry low, do not iron, do not dry clean.
  • This product is made on demand, with no minimum order quantity.
  • Multiple shipping methods available, and fees vary depending on the location and the shipping method selected.
  • For custom areas, please refer to the Yoycol mockup generator for details.
  • Notice: a variety of factors may cause slight differences between the actual product and the mock-up, including but not limited to colors and precision of elements position.

Size Guide

 

Inch L XL 2XL 3XL 4XL 5XL
Length 27.4  28.0  28.5  29.1  29.7  30.3 
Bust 44.9  47.2  49.6  52.0  54.3  56.7 
Sleeve 9.7  10.2  10.7  11.3  11.8  12.3 

 

Centimeter L XL 2XL 3XL 4XL 5XL
Length 69.5  71.0  72.5  74.0  75.5  77.0 
Bust 114.0  120.0  126.0  132.0  138.0  144.0 
Sleeve 24.7  26.0  27.3  28.6  29.9  31.2 

 

This size guide shows product measurements taken when products are laid flat. Actual product measurements may vary by up to 1".

View full details